Mining · Diversified commodity producer — iron ore, copper, lithium

IronPeak Mining Group

60,000

permanent staff

20,000–35,000

contractors

2.7

analytics maturity

Historically establishment-and-mobilise, with reactive contractor mobilisation and premium remote-labour cost closing the gaps. IronPeak is shifting toward foresighted availability matching, leading-indicator safety and fatigue intelligence, and contractor visibility — but the workforce data to run them (rostered crew vs. on-site presence vs. qualification vs. fitness, permanent and contractor, at the shift grain) is fragmented.

What keeps leadership up at night

Strategic challenges

Match available, fit, safe, qualified capacity to continuous production

Equipment availability measured to the decimal; workforce availability barely at all

Production is lost not to under-headcounting but to unavailable crews at remote sites with no bench — the binding continuity variable.

Make safety and fatigue predictive and preventive

Fatigue and inexperience repeatedly cited in serious incidents; safety seen only after the fact

The workforce is the population at risk, and the executive carries personal and statutory accountability for preventable harm.

Secure scarce tickets and statutory-role coverage

~27% of statutory-supervisor capacity retirement-eligible within five years

An operation legally cannot run without its statutory roles filled and qualified — coverage is a licence-to-operate constraint.

Bring the contractor workforce into the picture

Contractors 30–50%+ of site workforce, largely invisible in workforce data

A third or more of the at-risk, production-critical workforce is unseen in payroll-bounded data.

Shape of the workforce

Composition

Mining operations

30%

Maintenance & trades

24%

Processing

14%

Engineering & technical

10%

Logistics

8%

Geology & exploration

6%

Corporate & site administration

8%

The work

Projects

Strategic Workforce Planning: Plan the Available Workforce, Permanent and Contracted — IronPeak Mining Group
IronPeak Mining Group · Mining

Strategic Workforce Planning: Plan the Available Workforce, Permanent and Contracted

Over a 1–5 year horizon, where will workforce supply — permanent plus contractor — diverge from production demand by role, ticket and site, and how much of IronPeak's contractor reliance is structural rather than genuinely variable?

Plan & CostL3
~13%Workforce supply-demand gap

Sponsor · Chief People Officer

Workforce Availability Intelligence: Fit, Qualified, Rostered, On-Site — IronPeak Mining Group
IronPeak Mining Group · MiningFlagship

Workforce Availability Intelligence: Fit, Qualified, Rostered, On-Site

Shift by shift and site by site, will IronPeak have a fit-for-work, qualified, rostered, on-site crew sufficient for planned production — and where will availability fall short before it happens?

Plan & CostL4
~91%Workforce availability rate

Sponsor · Chief Operating Officer

Safety & Fatigue Intelligence: Protect the Workforce, Predictively — IronPeak Mining Group
IronPeak Mining Group · Mining

Safety & Fatigue Intelligence: Protect the Workforce, Predictively

Which crews, shifts and sites carry rising safety and fatigue risk — early enough to intervene — and which factors (fatigue, experience, crew mix, supervision, contractor integration) drive the risk for which population?

Protect & DiscloseL4
~24%High-risk crew-shift index

Sponsor · Chief HSE Officer

Critical Skills & Capability Intelligence: See the Lapse Before It Stops Production — IronPeak Mining Group
IronPeak Mining Group · Mining

Critical Skills & Capability Intelligence: See the Lapse Before It Stops Production

Where will critical-skill, ticket or statutory-role coverage lapse before it does — by site and qualification, across permanent and contractor workforces — and where is scarce capability under-deployed?

Grow & KeepL3
97%Critical-skill & ticket coverage

Sponsor · Chief Technical Officer

Mining Workforce Digital Twin: Simulate Before You Commit — IronPeak Mining Group
IronPeak Mining Group · Mining

Mining Workforce Digital Twin: Simulate Before You Commit

Under a given production, roster, contractor or automation scenario, what workforce does IronPeak need, can it get there, and does it remain available, safe and fatigue-sustainable throughout?

Plan & CostL5
2 of 4Scenario feasibility

Sponsor · Chief Operating Officer